Coming soon.
Pre-registration has been closed. Thank you!
+82 (2) 783-1711

EXHIBITOR

INTERMOLD KOREA 2023
Exhibition Operating Guide Exhibition Operating Guide
Exhibition Operating Guide
Raw-Space
Having an raw space booth means that the participant has rented only the exhibition area. The exhibitor is responsible for and must bear the expense of the installation and removal of its booth, and all the work must be done by companies registered with KINTEX.
  • Height : 5m
  • Multi-Storied booth is not available.
  • Rigging : over 450sqm (50 booths)
  • The wall cannot on the aisle side.

Booth Installation of Raw-space

  • For the smooth management and the complete construction in a short term, the installation parts should be prefabricated and carried in from outside.
  • For the construction of any booth, no wall should face the pathway. If it is inevitable, the booth may be set up after consultation with organizer.
    (The height of wall is limited 3m and it should be installed by less than one-third of each side of the booth and positioned at 1m far from the aisle to secure the view of beside exhibitor.)
  • The ceilings of all booths should be open. However, small offices and reception areas may have a roof.
  • All the materials (board, wood, carpet, etc.) for booth prefabrication should be flame retardant or incombustible.
  • All the installation including lighting equipment may not exceed the allotted booth area.

Height Limit

The height of all installation in the booth is limited to 5m. However, the height of the back wall can be 7m.
※ If the height of the exhibition booth exceeds 5m, a structural analysis stability review is required.

Installation Using a Ceiling

  • Only company taking more than 50 booths (450㎡) is allowed to install facilities on the ceiling. But, the facilities are limited to promotion banners or lights affixed to truss. And any promotional banners down the truss are not allowed.
  • The height of installation facilities using the ceiling is limited to 8 m(from the floor of exhibition hall to the bottom of truss)
  • When installing facilities by using the ceiling, the structure analysis and construction must be made by companies designated by KINTEX.
  • Construction must be possible after submitting the ceiling truss construction report and obtaining an approval for the report.
  • Structures descending from ceiling trusses shall be at least 8m apart from the floor of the showroom and shall not exceed a maximum width of 1.5m.

Submission of design drawings

  • The exhibitor and the constructing company must submit an application for the installation of raw space booth and the construction plan (blueprint, color model picture, specifications, etc.), two copies respectively, to the exhibitor by February 1(Wed), 2023. The construction may start only after the approval of the organizer.
  • If a exhibitor does not submit the application for the installation of raw space booth, it cannot construct the booth.

Work report

  • All the work in the exposition area must be reported in a written document by the constructing company, and the workers must wear admission cards indicating the constructing company.

Work Safety Instructions

  • All personnel entering and leaving the exhibition hall must wear a helmet during the installation period (March 11 ~ 13, 2023).

Paintwork

  • Paintwork is not allowed in the exhibition hall in principle but it is possible to do limited after 6 pm only for the seam finishing work. (※ Only water paint can be used)